steve.lucas88@gmail.com

365 Victoria Rd, Gladesville NSW 2111

timber preparation

Timber Preparation

A mistake which occurs quite often with new decks is applying an oil or stain too soon after the deck has been built. New decks require a period of 4 to 6 weeks weathering outdoors before the bare timber can be coated. This is because natural oils and tannins need to leach out of the timber before any coating is applied to the timber. Failing to do this will result in the top layer of the timber breaking down over time and may result in the decking requiring replacing.

However, we can use special products, which are designed to draw these oils and tannins out of the timber so you don’t have to wait 4 – 6 weeks before your new deck is ready for oiling or staining. You can now have your deck ready to enjoy sooner and looking its beautiful best, just as it was designed to be.

Steves Deck Rescue mainly service Sydney’s Northern Beaches, Northern Districts and Inner West but will travel anywhere in Sydney if required.

Power Washing Timber Sanding Timber Preparation Treatment of Mould and Moss Rejuvenation of Old Timber Timber Staining & Oiling

If you have some feedback please fill the form



verify

google-reviews